The PROVINCIAL GOVERNMENT OF AURORA, through its Bids and Awards Committee (BAC), invites all eligible contractors registered with and classified by the Philippine Contractors Accreditation Board (PCAB), to bid for the hereunder contract:

Name Of ProjectLocationApproved Budget for the Contract
CONSTRUCTION OF WAREHOUSE WITH MULTI-PURPOSE DRYING PAVEMENT (MPDP), BRGY. SALAY
Part 1 Site Development
100 Clearing and Grubbing,
804 Embankment,
Part 2 Warehouse,
403 Metal Structure,
704 Masonry Unit,
803 Structure Excavation,
900 Structural Concrete (Warehouse),
1018 Ceramic Tiles,
1002.2.2 Plumbing Works,
1001.2(a) PVC Pipes (sewerage),
1002(6) Plumbing Fixture,
1003 Carpentry Works,
1006 Steel Doors and Frames,
1013.2.2 Fabricated Metal Roofing Accessories,
1013.2.3 Roof Ventilators,
1014 Pre-Painted Metal sheets,
1027 Cement Plaster Finish,
1032(2) Painting,
100(14) Octagonal Junction Boxes,
100(15) PVC Pipes,
1100(1) RSC Conduit Pipe,
1101(6) Duplex Receptacles, ACU and Generator,
1101(3) Two -Gang Tumbler Switch,
1101(1) Electric Wires,
1100(11) Rubber Tapes,
1102 Power Load, CTR Switch Gear & Panel Board,
Special 1 Mobilization/ Demobilization,
Special 2 Occupational Safety and Health Program,
Special 3 Project Signboard,
Special 4 Project Signboard (COA),
Part 3 Multi-Purpose Drying Pavement,
900 Structural Concrete (MPDP),
200 Agg. Sub-Base Course
DIPACULAO, AURORA7,500,000.00
CONCRETING OF BARANGAY ROAD, BRGY. DITAWINI
Part A General Requirements
A.4 A.4 Construction Survey and staking
A.5(a) Project Signboard,
A.5(b) Project billboard/Signboard (COA)
A.7 Occupational Safety & Health program
A.9 Mobilization and Demobilization
Part B Earthworks,
100(1) Clearing and Grubbing (with stripping)
102(2)a Roadway Excavation(Surplus Common)
104(1)a Embankment from Borrow
105(1) Subgrade Preparation (Common Materials)
Part C Subbase and Base Course,
200 Aggregate Subbase Course
Part D Surface Course
311(1)a.2 PCCP Pavement (Plain)-Conventional Method, 200thk.,
Part E Slope Protection,
511(1) Gabion,
511(2) Mattresses
DINALUNGAN, AURORA2,500,000.00
CONSTRUCTION OF MULTI-PURPOSE HALL (PHASE II) BRGY. 2
SPCL -I Transshipment,
B.1 Construction Safety and Health Program,
B.2 Project Sign board,
B.3 Project Billboard/Sign Board (COA),
903(2) Formworks and Falseworks,
900 Reinforced Concrete,
902(1)a1 Reinforcing Steel of Reinforced Concrete Structures for two-storey, grade 40,
1046(2)a2 150mm CHB (including Reinforcing Steel),
1027(1) Cement plaster, finish,
1003(1)a1 Ceiling Works,
1032(1)a Panting works (Masonry & concrete painting),
1018(1) Tile Works
1053(2)a1 50mm Ǿ stainless Pipe handrail, fully welded,
105(1) uPVC Window,
1010(2)b Wooden Panel Door,
1010(1) Frames(Jambs, Still head, Transoms, and Mullions),
1004(2)a Lockset,
1004(2)g Hinges,
1010(2)a Fire Exit Door w/ Complete Accessories,
SPCL-II Electrical Works,
SPCL-III Plumbing Works
CASIGURAN, AURORA3,500,000.00
CONCRETING OF ROAD, BRGY. URA,
I.1 TRANSHIPMENT,
I.2 MOBILIZATION /DEMOBILIZATION,
I.3 SETTING OUT AND STAKING,
I.4 CONSTRUCTION SAFETY AND HEALTH PROGRAM,
I.5 PROJECT SIGNBOARD,
I.6 PROJECT BILLBOARD/ SIGNBOARD (COA),
100(1) CLEARING & GRUBBING (WITH STRIPPING), 104(1)a EMBANKMENT (FROM BORROW),
102(2)b ROADWAY EXCAVATION, (SURPLUSCOMMON),
105(1) SUBGRADE PREPARATION (COMMON MATERIAL), 200 AGGREGATE SUBBASE COURSE,
311(1)a.2 PCCP PAVEMENT (PLAIN)-CONVENTIONAL METHOD, 200MM THK.,
103(1)a STRUCTURE EXCAVATION(COMMON SOIL),
404 REINFORCING STEEL BAR, GRADE 40(MINOR STRUCTURE),
405 STRUCTURAL CONCRETE CLASS A (MINOR STRUCTURES)
DILASAG, AURORA10,000,000.00
CONSTRUCTION OF BOX CULVERT, BRGY. DECOLIAT
SPCL General Requirements,
I.1 Mobilization/ Demobilization,
I.2 Setting Out and Staking,
I.3 Construction Safety and Health Program,
I.4 Project Billboard (PGA),
I.5 Project Billboard (COA),
B.15 Detour/ACESS ROAD
100(1) Clearing and Grubbing (with Stripping),
101(2)c Removal of RCPC (36″ dia),-910mm,
103(1)a Structure Excavation(common soil),
104.0 Embankment(from Borrow),
105(1) Subgrade Preparation (Common Material)
200.0 Aggregate Base Course,
311(1)a.2 PCC Pavement (Plain) conventional method 200mm thk.,
404.0 Reinforcing Steel bar, Grade 40 (minor structures), 405.0 Structural concrete Class A (minor structures),
506.0 Stone Masonry
MARIA AURORA, AURORA2,600,000.00 Code number
CONSTRUCTION OF FLOOD CONTROL PROJECT, BRGY. DIAAT
I General Requirements,
I.1 Mobilization/ demobilization,
I.2 Setting out and stacking,
I.3 Construction Safety and Health Program,
I.4 Project Billboard (PGA),
I.5 Project Billboard (COA),
103(1)a Structure Excavation (Common Soil),
104(1)b Embankment from Roadway Excavation,
511(1) Gabions,
511(2) Mattresses
MARIA AURORA, AURORA5,000,000.00
CONCRETING OF ROADS AND ALLEYS, BRGY. COZO
I.1 Mobilization/ Demobilization,
I.2 Setting out and Staking,
I.3 Construction Safety and Health Program,
I.4 Project Signboard,
I.5 Project Billboard/ Signboard (COA),
100(1) Clearing & Grubbing (with Stripping),
105(1) Subgrade Preparation, (common materials),
104(1)a Embankment (from Borrow),
200 Aggregate Subbase Course,
311(1)a.2 PCCP Conventional Method (200mm thk)
CASIGURAN, AURORA4,000,000.00
COMPLETION OF TWO-STOREY MULTI-PURPOSE BUILDING, BRGY. LOBBOT
GENERAL REQUIREMENTS,
MOBILIZATION & DEMOBILIZATION,
CONSTRUCTION HEALTH SAFETY & PROJECT
SIGN BOARD (COA & PGA),
CONCRETE MASONRY WORKS,
FORMWORKS & SCAFFOLDING,
FABRICATED MATERIALS,
CARPENTRY WORKS,
DOORS & WINDOWS,
PAINTING WORKS,
TILE WORKS(INCLUDING CR),
DOWNSPOUT,
PLUMBLING WORKS,
ELECTRICAL WORKS
DIPACULAO, AURORA3,000,000.00
TOTAL  

Prospective bidders should possess a valid PCAB License applicable to the contract, have completed a similar contract with a value of at least 50% of the ABC, and have key personnel and equipment available for the prosecution of the contract.  The BAC will use non-discretionary pass/fail criteria in the Eligibility Check/Screening as well as the Preliminary Examination of Bids.  The BAC will conduct post-qualification of the lowest calculated bid.

The pertinent provisions of RA 9184 and its Implementing Rules and Regulations (IRR) shall govern all particulars relative to Eligibility Statement and Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation of Bids, Post Qualification and Award of Contract.

The schedule of BAC activities is as follows:

ActivitiesSchedule
1.  Issuance of Bid DocumentsAugust 1, 2022-August 22, 2022
2.  Pre-bid ConferenceAugust 9, 2022, @ 10:00AM
3.  Submission of Eligibility and BidsAugust 22, 2022 until 9:00 AM
4.  Opening of BidsAugust 22, 2022 @ 10:00 AM
  • Pre-Bid Conference/ Opening of Bids’ date is automatically re- scheduled to the next working day whenever such date is declared a holiday.

The BAC will issue to prospective bidders Eligibility Forms at BAC Secretariat Office, Capitol Compound, Baler, Aurora, upon their submission of a LOI.  Prospective bidders shall submit the Eligibility Requirements to the BAC at the said address.  They may also obtain the results of the

Eligibility Check by the BAC at the same address. Bids document will be available only to prospective bidders upon payment to the Provincial Treasurer’s Office (PTO) of the Provincial Government of Aurora (PGA) of non-refundable amount for the following approved budget for the contract:     

P                                        500,000.00               –                       below                        =                  P                      500.00

                                             500,001.00              –                       1,000,000.00           =                                       1,000.00

                                          1,000,001.00              –                       5,000,000.00           =                                        5,000.00

                                          5,000,001.00              –                     10,000,000.00           =                                      10,000.00

                                        10,000,001.00              –                     50,000,000.00           =                                      25,000.00

                                        50,000,001.00              –                 500,000,000.00           =                                      50,000.00

The Provincial Government of Aurora assumes no responsibility whatsoever to compensate or indemnify bidders for any expenses incurred in the preparation of the bid. Only those who have purchased the Bidding Documents shall be allowed to participate in the pre-bid conference and raise or submit written queries or clarifications.  The PGA also reserves the right to reject any or all bids, to declare the bidding a failure or waive any defect or informality and to accept bids as may be considered most advantageous to the PGA.