The PROVINCIAL GOVERNMENT OF AURORA, through its Bids and Awards Committee (BAC), invites all eligible contractors registered with and classified by the Philippine Contractors Accreditation Board (PCAB), to bid for the hereunder contract:

Name Of ProjectLocationApproved Budget for the Contract
CONSTRUCTION OF BARANGAY NUTRITION POST, BRGY. 1 POBLASYON,
I General Requirements
II Layout & Excavation
III Filling of Materials
IV Concrete Works,
V Formworks & Scaffolding,
VI Roof Framing & Tinsmitry Works,
VII Fabricated Pipe Railings,
VIII Celling Works,
IX Painting works,
X Electrical Works
CASIGURAN, AURORA800,000.00
WATER FACILITIES, BRGY. DINADIAWAN
I General Requirements,
I.1 Mobilization/staking,
I.2 Construction Safety and Health Program,
I.3 Project Sign board(PGA),
I.4 Project Sign board(COA),
103(1)a Structural Excavation (Common Soil),
404 Reinforcing Steel Bar, Grade 40 (Minor structure), 405 Structural concrete class A (minor structures)
DIPACULAO, AUROA500,000.00
SPRING DEVELOPMENT IN SO. FERRY, MARKET SITE. SO. BACONG, BRGY. UMIRAY
General Requirements,
I.1 Mobilization and Demobilization,
I.2 Setting Out and Stacking,
I.4 Project Sign Board,
103(1)a Excavation (Common Soil),
104(4) Embankment,
SPCL Pipe Laying
DINGALAN, AURORA1,800,000.00
SPRING DEVELOPMENT IN SO. FERRY, MARKET SITE. SO. BACONG, BRGY. UMIRAY
General Requirements,
I.1 Mobilization and Demobilization,
I.2 Setting Out and Stacking,
I.4 Project Sign Board,
103(1)a Excavation (Common Soil),
104(4) Embankment,
SPCL Pipe Laying
DIPACUALO, AURORA600,000.00
CONSTRUCTION OF MULTI-PURPOSE BUILDING AT CASIGURAN CENTRAL SCHOOL CASIGURAN
SPCL I General Requirements, (PGA & COA Sign Board Construction Safety & Health Program and other Required Documents),
803(1)a Structure Excavation (Common Soil),
804 Gravel Bedding,
900 Reinforced Concrete,
902(1)a1 Reinforcing Steel of Reinforced Concrete Structures, Grade 40,
903(2) Formworks and Falseworks,
1027(1) Cement Plaster Finish,
1047(2)b Structural steel purlins,
1047(2)a structural steel, trusses, strut,
1047(6) Metal structure Accessories (steel plates),
1047(7)b Metal structure Accessories (sagrod),
1047(4) Metal structure Accessories (crossbracing),
1047(3)c Metal structure Accessories (Turnbuckle),
1014(1)b1 Prepainted Metal Sheets (Corrugated, Long Span, 0.5mm thk.),
1032(1)c Painting Works(metal painting),
1032 Painting works(concrete surfaces, slab, not included),
SPCL II Electrical Works
CASIGURAN, AURORA2,500,000.00
TOTAL  

Prospective bidders should possess a valid PCAB License applicable to the contract, have completed a similar contract with a value of at least 50% of the ABC, and have key personnel and equipment available for the prosecution of the contract.  The BAC will use non-discretionary pass/fail criteria in the Eligibility Check/Screening as well as the Preliminary Examination of Bids.  The BAC will conduct post-qualification of the lowest calculated bid.

The pertinent provisions of RA 9184 and its Implementing Rules and Regulations (IRR) shall govern all particulars relative to Eligibility Statement and Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation of Bids, Post Qualification and Award of Contract.

The schedule of BAC activities is as follows:

ActivitiesSchedule
1.  Issuance of Bid DocumentsAugust 1, 2022-August 24, 2022
2.  Pre-bid ConferenceAugust 9, 2022, @ 10:00AM
3.  Submission of Eligibility and BidsAugust 24, 2022 until 9:00 AM
4.  Opening of BidsAugust 24, 2022 @ 10:00 AM
  • Pre-Bid Conference/ Opening of Bids’ date is automatically re- scheduled to the next working day whenever such date is declared a holiday.

The BAC will issue to prospective bidders Eligibility Forms at BAC Secretariat Office, Capitol Compound, Baler, Aurora, upon their submission of a LOI.  Prospective bidders shall submit the Eligibility Requirements to the BAC at the said address.  They may also obtain the results of the

Eligibility Check by the BAC at the same address. Bids document will be available only to prospective bidders upon payment to the Provincial Treasurer’s Office (PTO) of the Provincial Government of Aurora (PGA) of non-refundable amount for the following approved budget for the contract:     

P                                        500,000.00               –                       below                        =                  P                      500.00

                                             500,001.00              –                       1,000,000.00           =                                       1,000.00

                                          1,000,001.00              –                       5,000,000.00           =                                        5,000.00

                                          5,000,001.00              –                     10,000,000.00           =                                      10,000.00

                                        10,000,001.00              –                     50,000,000.00           =                                      25,000.00

                                        50,000,001.00              –                 500,000,000.00           =                                      50,000.00

The Provincial Government of Aurora assumes no responsibility whatsoever to compensate or indemnify bidders for any expenses incurred in the preparation of the bid. Only those who have purchased the Bidding Documents shall be allowed to participate in the pre-bid conference and raise or submit written queries or clarifications.  The PGA also reserves the right to reject any or all bids, to declare the bidding a failure or waive any defect or informality and to accept bids as may be considered most advantageous to the PGA.