The PROVINCIAL GOVERNMENT OF AURORA, through its Bids and Awards Committee (BAC), invites all eligible contractors registered with and classified by the Philippine Contractors Accreditation Board (PCAB), to bid for the hereunder contract:
Name Of Project | Location | Approved Budget for the Contract |
CONSTRUCTION OF OPEN CANAL BRGY. TOYTOYAN I General Requirements I.1 Mobilization and Demobilization I.2 Setting out and Staking I.3 Construction Safety and Health I.4 Project Sign Board (COA) I.5 Project Sign Board (PGA) 101(1) Removal of Structures and Obstruction (other than concrete) 103(1)a Structure Excavation (Common Soil) 104(4) Earth Bern 404 Reinforcing Steel Bar, Grade 40 405 Structural Concrete Class A | DIPACULAO, AURORA | 1,000,000.00 |
CONSTRUCTION OF SCHOOL STAGE AT LUAL NATIONAL HIGH SCHOOL (LNHS) SPCL –I Transhipment B.1 Construction Safety and Health Program B.2 Project Sign board B.3 Project Billboard/Sign Board (COA) 903(2) Formworks and Falseworks 803(1)a Structure Excavation (Common Soil) 804 Embankment 900 Reinforced Concrete 902(1)a1 Reinforcing Steel of Reinforced Concrete Structures for two-storey, Grade 40 1046(2)a1 100mm CHB (includding Reinforcing steel) 1047(2)b Structural steel purlins 1047(2)a Structural steel, trusses, strut 1047(6) Metal structure accessories(steel plates) 1047(7)b Metal structure accessories(sagrods) 1014(1)b1 Prepainted metal sheets(corrugated, long span, 0.5mm thk.) 1027(1) Cement Plaster finish 1003(1)a1 Celling works 1018(1) Tile works 1005(1) uPVC window 1010(2)b Wooden Panel door SPCL-II Electrical Works | CASIGURAN, AURORA | 1,500,000.00 |
CONSTRUCTION OF 2-STOREY MULTI-PURPOSE BUILDING, BRGY. DITEKI I General Requirements II Layout Excavation & Backfilling III Filling of Materials IV Concrete & Masonry Works V Formworks & Scaffolding VI Doors & Windows VII Tile Works(CR Only) VIII Plumbing Works, IX Electrical Works | SAN LUIS, AURORA | 2,500,000.00 |
IMPROVEMENT OF DINGALAN-UMIRAY PROVINCIAL ROAD Part A-Facilities for the Engineers A.1 .1(8) Provision of Field office for the Engineer Part B- Other General Requirements B-4 Construction Survey & Staking B.5 Project Billboard/ Signboard B.7(2) Occupational Safety and Health Program B.8(2) Traffic Management B.9 Mobilization& Demobilization Part C Earthworks 100(1) Clearing & Grubbing (with stripping) 100(3)a1 Individual Removal of Trees (small a, 150-300mmǾ) 101(3)b3 Removal of Actual Structures/ Obstruction(PCCP unreinforced) 102(3)a Surplus Rock Excavation(soft) 103(1)a Structure Excavation(common soil) 104(2)a Embankment from Borrow(Common soil) 105(1) Subgrade Preparation (Common Material) Part D Subbase and Base Course 200 Aggregate Subbase Course Part E Surface Course 311(1)C.1 Portland Cement Concrete Pavement (unreinforced) 230mm thk. -14days Part G- Drainage & Slope Protection Structures 404(1)a Reinforcing Steel Bar, Grade 40 (Minor Structures) 405(1)a3 Structural Concrete Class A (Minor Structure) 407(8) Lean Concrete Class B(16.50 Mpa) 506(1) Stone Masonry Part H Miscellaneous Structures 605(1)a1 Danger/Warning Signs(60cm Triangle), 605(6)e1 Hazard Markers(450mmx600mm Chevron Signs) 612(1) Reflectorized Thermoplastic Pavement Markings(white) 612(2) Reflectorized Thermoplastic Pavement Markings(yellow) | DINGALAN, AURORA | 30,000,000.00 |
CONSTRUCTION OF ROAD, PUROK 2,3 & 5, BRGY. CARAGSACAN Part A Facilities for the Engineers A.1.1(8)Provision of Field office for the Engineer Part B Other General Requirements B.4 Construction Survey and Staking B.5(a) Project Sign board B.5(b) Project Billboard/ Sign Board(COA) B.7 Occupational Safety & Health Program B. Mobilization/Demobilization Part C. Earth works 100(1) Clearing and Grubbing (with Stripping ) 103(1)a Structure Excavation (common soil) 104(1)a Embankment from borrow 105(1) Subgrade preparation (common material) Part D Subbase and Base Course, 201Aggregate Base Course Part E Surface Course 311(1)a.1 PCC Pavement (Plain)-Conventional Method, 150 thk. | DINGALAN, AURORA | 2,000,000.00 |
REHABILITATION OF PUBLIC MARKET BRGY. DIAGYAN SPCL –I Transshipment B.1 Construction Safety and Health Program B.2 Project Sign Board B.3 Project Billboard/ Signboard (COA) SPCL II Demolition and Removal of Existing Structure 903(2) Formworks and Falseworks 803(1)a Structure Excavation (Common Soil) 804 Embankment 900 Reinforce Concrete 902(1)a1 Reinforcing Steel of Concrete, Structure Grade 40, 100mm CHB (Including Reinforcing Steel) 1047(2)b Structural Steel Purlins 1817.1 Structural Steel Trusses, Strut 1047(6) Metal Structure Accessories, (Steel Plates) 1047(7)b Metal Structure Accessories(Sagrods) 1014(1)b1 Prepainted Metal Sheet (Corrugated, Long Span,0.5mm thk.) 1027(1) Cement Plaster Finish 1003(1)a1 Ceilling Works 1032(1)a Painting Works (Masonry & Concrete Painting) 1032(1)c Painting Works (Metal Painting) 1032(1)b Painting Works(Wood Painting) 1005(1) uPVC Window 1010(2)b Wooden Panel Door 1010(1) Roll up Door w/ Complete Accessories, SPCL III Electrical Works | DILASAG, AURORA | 2,000,000.00 |
TOTAL |
Prospective bidders should possess a valid PCAB License applicable to the contract, have completed a similar contract with a value of at least 50% of the ABC, and have key personnel and equipment available for the prosecution of the contract. The BAC will use non-discretionary pass/fail criteria in the Eligibility Check/Screening as well as the Preliminary Examination of Bids. The BAC will conduct post-qualification of the lowest calculated bid. powerpoint indir ücretsiz türkçe
The pertinent provisions of RA 9184 and its Implementing Rules and Regulations (IRR) shall govern all particulars relative to Eligibility Statement and Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation of Bids, Post Qualification and Award of Contract. movavi clé d’activation
The schedule of BAC activities is as follows:
Activities | Schedule |
1. Issuance of Bid Documents | September 13, 2022-October 3, 2022 until 9:00 AM |
2. Pre-bid Conference | September 19, 2022, @ 10:00AM |
3. Submission of Eligibility and Bids | October 3, 2022 until 9:00 AM |
4. Opening of Bids | October 3, 2022 @ 10:00 AM |
- Pre-Bid Conference/ Opening of Bids’ date is automatically re- scheduled to the next working day whenever such date is declared a holiday.
The BAC will issue to prospective bidders Eligibility Forms at BAC Secretariat Office, Capitol Compound, Baler, Aurora, upon their submission of a LOI. Prospective bidders shall submit the Eligibility Requirements to the BAC at the said address. They may also obtain the results of the
Eligibility Check by the BAC at the same address. Bids document will be available only to prospective bidders upon payment to the Provincial Treasurer’s Office (PTO) of the Provincial Government of Aurora (PGA) of non-refundable amount for the following approved budget for the contract:
P 500,000.00 – below = P 500.00
500,001.00 – 1,000,000.00 = 1,000.00
1,000,001.00 – 5,000,000.00 = 5,000.00
5,000,001.00 – 10,000,000.00 = 10,000.00
10,000,001.00 – 50,000,000.00 = 25,000.00
50,000,001.00 – 500,000,000.00 = 50,000.00
The Provincial Government of Aurora assumes no responsibility whatsoever to compensate or indemnify bidders for any expenses incurred in the preparation of the bid. Only those who have purchased the Bidding Documents shall be allowed to participate in the pre-bid conference and raise or submit written queries or clarifications. The PGA also reserves the right to reject any or all bids, to declare the bidding a failure or waive any defect or informality and to accept bids as may be considered most advantageous to the PGA.