The PROVINCIAL GOVERNMENT OF AURORA, through its Bids and Awards Committee (BAC), invites all eligible contractors registered with and classified by the Philippine Contractors Accreditation Board (PCAB), to bid for the hereunder contract:
Name Of Project | Location | Approved Budget for the Contract |
CONSTRUCTION OF TWO-STOREY MULTI-PURPOSE HALL, BRGY. BANGCO I General Requirements,(Including Mobilization, Demobilization Construction Safety and Sign Board (COA & PGA)) II Layout & Excavation III Filling of Materials IV Concrete Masonry Works V Tile Works (CR only) VI Formworks & Scaffolding VII Doors and Windows VIII Plumbing Works IX Electrical Works | MARIA AURORA, AURORA | 2,500,000.00 |
RENOVATION OF BRGY. HEALTH CENTER, BRGY. DITUMABO I General Requirements II Demolition Works and Dismantling III Concrete Works IV Masonry Works V Septic Tank VI Formworks & Scaffolding VII Roof Framing VIII Tinsmithry IX Fabricated Materials X Carpentry Works XI Doors & Windows XII Painting Works XIII Tile Works XIV Downspout & Catch basin XV Plumbing Works XVI Electrical Works | SAN LUIS, AURORA | 2,000,000.00 |
CONSTRUCTION OF MULTI-PURPOSE HALL, BRGY. DIAMANEN SPCL-1 General Requirements(PGA & COA Signboard, Construction Safety & Health Program and Other Required Documents 803(1)a Structure Excavation (Common Soil) 804 Gravel Bedding/ Filling Materials 900 Reinforced Concrete 902(1)a1 Reinforcing Steel of Reinforced Concrete Structures Grade 40, 903(2) Formworks and Falseworks 1027(1) Cement Plaster Finish 1047(2)b Structural Steel Purlins 1047(2)a Structural Steel, Trusses, Strut 1047(6) Metal Structure Accessories (Steel Plates) 1047(7)b Metal Structure Accessories (Sagrods) 1047(4) Metal Structure Accessories (Crossbracing) 1047(3)c Metal Structure Accessories (Turnbuckle) 1014(1)b1 Prepainted Metal Sheet (Corrugated, long Span, 0.5mm thk) 1032(1)c Painting Works (Metal Painting) | DIPACULAO, AURORA | 2,500,000.00 |
CONSTRUCTION OF MULTI-PURPOSE HALL, BRGY. DIAMANEN SPCL-1 General Requirements(PGA & COA Signboard, Construction Safety & Health Program and Other Required Documents 803(1)a Structure Excavation (Common Soil) 804 Gravel Bedding/ Filling Materials 900 Reinforced Concrete 902(1)a1 Reinforcing Steel of Reinforced Concrete Structures Grade 40, 903(2) Formworks and Falseworks 1027(1) Cement Plaster Finish 1047(2)b Structural Steel Purlins 1047(2)a Structural Steel, Trusses, Strut 1047(6) Metal Structure Accessories (Steel Plates) 1047(7)b Metal Structure Accessories (Sagrods) 1047(4) Metal Structure Accessories (Crossbracing) 1047(3)c Metal Structure Accessories (Turnbuckle) 1014(1)b1 Prepainted Metal Sheet (Corrugated, long Span, 0.5mm thk) 1032(1)c Painting Works (Metal Painting) | BALER, AURORA | 2,000,000.00 |
IMPROVEMENT OF NEW OFFICE AT ATC COMPOUND, SO. SETAN, BRGY. CALABUANAN I Mobilization/ Demobilization II Temporary Facilities and Billboard III Safety and Health IV Removal of Structure and Obstructions V Excavation VI Scaffolding VII Concrete and Masonry Works VIII Roofing Works IX Plumbing Works X Electrical Works XI Doors and Windows | BALER, AURORA | 2,000,000.00 |
IMPROVEMENT OF PGA OFFICE BUILDINGS, CAPITOL COMPOUND, BRGY. SUKLAYIN I General Requirements I.1 Mobilization/Demobilization A.I.1 Provision of Field Office for the Engineers B.5(a) Project Billboard/Signboard(PGA) B.5(b) Project Billboard/ Signboard (COA) B.7 Occupational Safety & Health II Removal of Existing Structure, Wood Flooring and Partition III Plain & Reinforced Concrete and Masonry Works 900 Reinforced Concrete 902(1)a1 Reinforcing Steel of Reinforced Concrete Structures Grade 40 903(2) Formworks and Falseworks 1046(2)a1 100mm CHB Non-Load Bearing (Including Reinforcing Steel) IV Plastering 1027(1) Cement Plaster Finish V Installation of Wood girl, beam and Wood planks VI 1/4thk. Marine Plywood on Metal frame Ceiling VII Installation of 1/2 thk. Marine board wall partition on metal frame with1/2″ Tempered glass VIII Tile Works 1018(1) Glazed Tile & Trim (Toilet Wall & Pantry counter) 1018(2) Unglazed Tile (Tiled Works at toilet floor) IX Water Proofing X Doors 1010(2)a D1& D2-UPVC 1/4″ Fixed Glass Door include Jamb & Frame, Handle and Look XI Window 1005(1) W1-UPVC Coated Sliding Window / 1/4″ Fixed Glass Include Jamb & Frame, Handle and Look XII Painting Works 1032(1)a Painting Works (Masonry Painting) 1032(2)a Painting Works (Wood Painting) 1032(3)a Painting Works (Inside Celling Painting) 1032(4)a Painting Works (Outside Metal Ceiling Painting) XIII Plumbing Works 1001(8) Sewer line works 1002(6) Cold water line works 1002(7) Sanitary Plumbing fixture XIV Electrical Works | BALER, AURORA | 4,000,000.00 |
TOTAL |
Prospective bidders should possess a valid PCAB License applicable to the contract, have completed a similar contract with a value of at least 50% of the ABC, and have key personnel and equipment available for the prosecution of the contract. The BAC will use non-discretionary pass/fail criteria in the Eligibility Check/Screening as well as the Preliminary Examination of Bids. The BAC will conduct post-qualification of the lowest calculated bid. kms lite
The pertinent provisions of RA 9184 and its Implementing Rules and Regulations (IRR) shall govern all particulars relative to Eligibility Statement and Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation of Bids, Post Qualification and Award of Contract. fl studio 20 full crack
The schedule of BAC activities is as follows:
Activities | Schedule |
1. Issuance of Bid Documents | September 13, 2022-October 4, 2022 until 9:00 AM |
2. Pre-bid Conference | September 19, 2022, @ 10:00AM |
3. Submission of Eligibility and Bids | October 4, 2022 until 9:00 AM |
4. Opening of Bids | October 4, 2022 @ 10:00 AM |
- Pre-Bid Conference/ Opening of Bids’ date is automatically re- scheduled to the next working day whenever such date is declared a holiday.
The BAC will issue to prospective bidders Eligibility Forms at BAC Secretariat Office, Capitol Compound, Baler, Aurora, upon their submission of a LOI. Prospective bidders shall submit the Eligibility Requirements to the BAC at the said address. They may also obtain the results of the
Eligibility Check by the BAC at the same address. Bids document will be available only to prospective bidders upon payment to the Provincial Treasurer’s Office (PTO) of the Provincial Government of Aurora (PGA) of non-refundable amount for the following approved budget for the contract:
P 500,000.00 – below = P 500.00
500,001.00 – 1,000,000.00 = 1,000.00
1,000,001.00 – 5,000,000.00 = 5,000.00
5,000,001.00 – 10,000,000.00 = 10,000.00
10,000,001.00 – 50,000,000.00 = 25,000.00
50,000,001.00 – 500,000,000.00 = 50,000.00
The Provincial Government of Aurora assumes no responsibility whatsoever to compensate or indemnify bidders for any expenses incurred in the preparation of the bid. Only those who have purchased the Bidding Documents shall be allowed to participate in the pre-bid conference and raise or submit written queries or clarifications. The PGA also reserves the right to reject any or all bids, to declare the bidding a failure or waive any defect or informality and to accept bids as may be considered most advantageous to the PGA.