The PROVINCIAL GOVERNMENT OF AURORA, through its Bids and Awards Committee (BAC), invites all eligible contractors registered with and classified by the Philippine Contractors Accreditation Board (PCAB), to bid for the hereunder contract:
Name Of Project | Location | Approved Budget for the Contract |
REPAIR & MAINT.,-INFRASTRUCTURE ASSESTS(IMPROVEDMENT OF CASIGURAN – DILASAG PROVINCIAL ROAD), DIMASESET SECTION PART B General Requirements B.5a Project Billboard/Signboard (PGA) B.5b Project Sign Board (COA) B.7 Occupational Safety and Health Program B.9 Mobilization/ Demobilization Part C Earthwork 101(3)b3 Removal of Actual Structures/ Obstruction (PCCP UNREINFORCED) 104(1)b Embankment from Borrow 105(1) Subgrade Preparation (common material) Part D Subbase and Base Course 200 Aggregate Subbase Course Part E Surface Course 311(1)a2 PCC Pavement (Plain)- Conventional Method Part G Drainage and slope protection works 404 Reinforcing steel bars G40 405 Structural Concrete Class A 509(2)a Sheet Pile (Steel Slope Protection) | DILASAG, AURORA | 6,000,000.00 |
REPAIR & MAINT.,-INFRASTRUCTURE ASSESTS (REPAIR OF SLOPE PROTECTION), BRGY. DIOME I General requirements I.1 Mobilization/ Demobilization I.2 Setting Out and Stacking I.3 Construction Safety and Health Program I.4 Project Signboard (PGA&COA) and signage’s 103.(1)a Structure Excavation (Common Soil) 1710(2)a Grouted Riprap (Class A) 804(a) Backfilling of Excavated Materials 104(1)a Embankment (from Borrow) | MARIA AURORA, AURORA | 524,954.63 |
REPAIR & MAINT.,-INFRASTRUCTURE ASSESTS(INSTALLATION OF ROAD GUARDRAIL DIMALANG BRIDGE ALONG CASIGURAN-DILASAG PROVINCIAL ROAD) Part B Other General Requirements B.5 Project Billboard/Signboard B.7 Occupational Safety and Health Program Part H Miscellaneous Structures 603(3)a Metal Guardrail (Metal Beam) Including Concrete Post 603(3)b Guardrail End Piece 605(2)a Regulatory Sign, 600mm Circular Pos, 612(1) Reflectorized Thermoplastic Pavement Markings (white) 612(2) Reflectorized Thermoplastic Pavement Markings (Yellow) | CASIGURAN, AURORA | 900,000.00 |
REPAIR AND MAINTENACE -INFRASTRUCTURE ASSETS (REPAIR OF SLOPE PROTECTION ALONG QUIRINO-DEBUCAO PROVINCIAL ROAD) I General Requirements I.1 Mobilization/ Demobilization I.2 Setting Out and Staking I.3 Construction and Safety and Health Program I.4 Project Signboard (PGA & COA) and Signage 103(1)a Structure Excavation (Common Soil) 500 Reinforced Concrete Pipe Culvert 1710(2)a Grouted Riprap (Class A) 804(a) Backfilling of Excavated Materials 104(1)a Embankment (From Borrow) | MARIA AURORA, AURORA | 1,500,000.00 |
OTHER LAND IMPROVEMENTS AURORA MEMORIAL HOSPITAL BRGY. RESERVA I General Requirements (Including Mobilization & Demobilization Construction Health Safety & Project Sign Board (COA & PGA) II Regraveling of Hospital Area III Layout & Excavation IV Filing of Materials V Concrete & Masonry Works VI Formworks & Scaffolding VII Tinsmithry works VIII Fabricated materials IX Painting works X Electrical Works (for cover Pathway) | BALER, AURORA | 2,200,000.00 |
CONSTRUCTION OF LINE CANAL (PHASE II), PUROK YAKAL, BRGY. PALTIC SPCL I General Requirements, I.1 Mobilization/ Demobilization I.2 Construction Survey & and Staking I.3 Construction Safety and Health Program I.4 Project Signboard I.5 Project Signboard COA 103(1)a Structure Excavation (common soil) 404 Reinforcing Steel Bar. Grade 40 (Minor Structures) 405 Structural Concrete Class A (Minor Structures) | DINGALAN, AURORA | 400,000.00 |
TOTAL |
Prospective bidders should possess a valid PCAB License applicable to the contract, have completed a similar contract with a value of at least 50% of the ABC, and have key personnel and equipment available for the prosecution of the contract. The BAC will use non-discretionary pass/fail criteria in the Eligibility Check/Screening as well as the Preliminary Examination of Bids. The BAC will conduct post-qualification of the lowest calculated bid. indesign download crack
The pertinent provisions of RA 9184 and its Implementing Rules and Regulations (IRR) shall govern all particulars relative to Eligibility Statement and Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation of Bids, Post Qualification and Award of Contract.
The schedule of BAC activities is as follows:
Activities | Schedule |
1. Issuance of Bid Documents | September 13, 2022-October 5, 2022 until 9:00 AM |
2. Pre-bid Conference | September 19, 2022, @ 10:00AM |
3. Submission of Eligibility and Bids | October 5, 2022 until 9:00 AM |
4. Opening of Bids | October 5, 2022 @ 10:00 AM |
- Pre-Bid Conference/ Opening of Bids’ date is automatically re- scheduled to the next working day whenever such date is declared a holiday.
The BAC will issue to prospective bidders Eligibility Forms at BAC Secretariat Office, Capitol Compound, Baler, Aurora, upon their submission of a LOI. Prospective bidders shall submit the Eligibility Requirements to the BAC at the said address. They may also obtain the results of the
Eligibility Check by the BAC at the same address. Bids document will be available only to prospective bidders upon payment to the Provincial Treasurer’s Office (PTO) of the Provincial Government of Aurora (PGA) of non-refundable amount for the following approved budget for the contract:
P 500,000.00 – below = P 500.00
500,001.00 – 1,000,000.00 = 1,000.00
1,000,001.00 – 5,000,000.00 = 5,000.00
5,000,001.00 – 10,000,000.00 = 10,000.00
10,000,001.00 – 50,000,000.00 = 25,000.00
50,000,001.00 – 500,000,000.00 = 50,000.00
The Provincial Government of Aurora assumes no responsibility whatsoever to compensate or indemnify bidders for any expenses incurred in the preparation of the bid. Only those who have purchased the Bidding Documents shall be allowed to participate in the pre-bid conference and raise or submit written queries or clarifications. The PGA also reserves the right to reject any or all bids, to declare the bidding a failure or waive any defect or informality and to accept bids as may be considered most advantageous to the PGA. driver booster 9.1 lisans kodu