The PROVINCIAL GOVERNMENT OF AURORA, through its Bids and Awards Committee (BAC), invites all eligible contractors registered with and classified by the Philippine Contractors Accreditation Board (PCAB), to bid for the hereunder contract:

Name Of ProjectLocationApproved Budget for the Contract
CONSTRUCTION OF OVERHEAD WATER TANK (BRGY. PROPER) BRGY. CALANTAS
I General Requirements
II Excavation
III Concrete Works
IV Finishing
V Formworks and scaffolding
VI Construction of Free Flowing
VII Fittings and Connections
VIII Pipe Laying
CASIGURAN, AURORA        2,000,000.00  
CONCRETING OF QUIRINO -STA. LUCIA ROAD
SPCL General Requirements
I.1 Mobilization/Demobilization
I.2 Setting Out and Staking
I.3 Construction Safety and Health Program
I.4 Project Billboard (PGA)
I.5 Project Billboard (COA)
104 Embankment (from Borrow), Subgrade Preparation (Common Material),
105(1) Aggregate Base Course,
200 PCCP Pavement (plain) – Conventional Method, 200thk.
505(5) Grouted Riprap (Class A)
MARIA AURORA, AURORA  3,000,000.00
CONCRETING OF ROAD PUROK 3, BRGY. DIMABUNO
PART A General Requirements,
 A.4 A.4 Construction Survey and staking
A.5(a) Project Signboard
A.5(b) Project billboard/Signboard (COA)
A.7 Occupational safety & Health program
A.9 mobilization and demobilization
PART B Earthworks
100(1) Clearing and Grubbing (with stripping)
102(2)a Roadway Excavation( Surplus Common)
104(1)a Embankment from Borrow
105(1) Subgrade Preparation (Common Material)
PART C Subbase and Base Course
200 Aggregate Subbase Course
PART D Surface course
311(1)a.2 PCCP Pavement (Plain) – Conventional Method, 200mm thk.
DIPACULAO, AURORA2,000,000.00
CONSTRUCTION OF SENIOR CITIZENS BUILDING, BRGY. DIOME
I General Requirements
II Earth Works,
803 Excavation of Column,  Footing and WF Footing
804(a) Backfilling of excavated, Materials
804(b) Gravel Bedding
III Concrete Works,
900 Reinforce Concrete
902(1)a1 Reinforcing Steel of Reinforced Concrete structures, grade 40,
903(2) Formworks and Falseworks
IV Masonry works
1046(2)a2 150mm CHB Non-Load Bearing, (including Reinforcing steel)
1046(2)a1 100mm CHB Non-Load Bearing (Including Reinforcing Steel)
V Fabricated Materials and Hardware’s
W-1,2&3 uPVC Sliding window, Dark Oak Finish
D-1&2 Solid Panel Door, Tanguile KD in Paint Finish and Flush Door, uPVC in wenge Semi-Gloss Finish
VI. Finishing Works
1027(a) Plain Cement Plaster finish
1021(c-1) Plain cement floor Finish
VII Tile Works
1018(2) Glazed Wall Tiles and Unglanzed Tiles/ non-skid Tiles (CR)
VIII Carpentry Works
1003(1)a1 1/4thk” Marine Plywood on Metal Frame Celling, (CR only)
IX  Railings
1053(2)a2 1.5 inches, Ǿ Gauge #304 stainless pipe handrail on vertical railing stiffener
X Sanitary works
XI Plumbing Works (water line)
XII Roofing and Tinsmithry works
XIII Painting works,
1032(1)b Painting Works (MASONRY PAINTING)
1032(1)c Painting Works(STEEL/ METAL PAINTING),
XIV ELECTRICAL WORKS
MARIA AURORA, AURORA  1,200,000.00
CONCRETING OF FARM TO MARKET ROAD, BRGY. GALINTUJA
SPCL General Requirements,
I.1 Mobilization/Demobilization,
I.2 Setting Out and Staking,
I.3 Construction Safety and Health Program,
I.4 Project Billboard (PGA),
I.5 Project Billboard (COA),
104 Embankment (from Borrow),
105(1) Subgrade Preparation (Common Material),
200 Aggregate Base Course,
311(1)a.2 PCCP Pavement (plain) – Conventional Method, 200thk.,
103(1)a Structure Excavation (Common Soil)
505(5) Grouted Riprap (Class A)
MARIA AURORA, AURORA2,000,000.00  
CONCRETING OF BARANGAY ROAD, BRGY. FLORIDA
SPCL General Requirements,
I.1 Mobilization/Demobilization,
I.2 Setting Out and Staking,
I.3 Construction Safety and Health Program,
I.4 Project Billboard (PGA),
I.5 Project Billboard (COA),
104 Embankment (from Borrow),
105(1) Subgrade Preparation (Common Material),
200 Aggregate Base Course,
311(1) a.2 PCCP Pavement (plain) – Conventional Method, 200thk.
MARIA AURORA, AURORA  3,000,000.00
CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DIBUTUNAN
I GENERAL REQUIREMENTS,
II LAYOUT & EXCAVATION,
III FILLING OF MATERIALS,
IV CONCRETE & MASONRY WORKS,
V FORMWORKS & SCAFFOLDING,
VI ROOF FRAMING & TINSMITHRY WORKS,
VII FABRICATED MATERIALS,
VIII CARPENTRY WORKS,
IX DOORS & WINDOWS,
X PAINTING WORKS,
XI PLUMBING WORKS,
XII ELECTRICAL WORKS
DIPACULAO, AURORA2,500,000.00
CONSTRUCTION OF MULTI-PURPOSE HALL, BRGY. OBLIGACION
I GENERAL REQUIREMENTS
II CONCRETE & MASONRY WORKS
III FORMWORKS & SCAFOLDING
IV CARPENTRY WORKS
V DOORS AND WINDOWS
VI PAINTINGS WORKS
VII TILE WORKS
VII DOWN SPOUT (ROUGH IN)
IX ELECTRICAL WORKS
BALER, AURORA2,500,000.00
CONSTRUCTION OF FARM TO MARKET ROAD, BRGY. WENCESLAO TO BRGY. STO. TOMAS
SPCL General Requirements,
I.1 Mobilization/Demobilization,
I.2 Setting Out and Staking,
I.3 Construction Safety and Health Program,
I.4 Project Billboard (PGA),
I.5 Project Billboard (COA),
100(1) Clearing & grubbing (with stripping)
104 Embankment (from Borrow),
105(1) Subgrade Preparation (Common Material),
200 Aggregate Base Course,
311(1)a.2 PCCP Pavement (plain) – Conventional Method, 200thk.
103(1)a structure excavation (common soil),
500(1)c Pipe Culverts, 910mm dia.(36″Ǿ),
505(5) Grouted Riprap (class A- headwall)
MARIA AURORA, AURORA  3,000,000.00
PIPE LAYING AT SO. PROPER, BRY. CALANTAS
I General Requirements,
II Excavation,
III Concrete Works,
IV Formworks and scaffolding,
V Fittings and Connections,
VI Pipe Laying
CASIGURAN, AURORA2,000,000.00
CONSTRUCTION OF SENIOR CITIZENS BUILDING, BRGY. OBLIGACION
I General Requirements
II Earth Works,
803 Excavation of Column,  Footing and WF Footing
804(a) Backfilling of excavated, Materials
804(b) Gravel Bedding
III Concrete Works,
900 Reinforce Concrete
902(1)a1 Reinforcing Steel of Reinforced Concrete structures, grade 40,
903(2) Formworks and Falseworks
IV Masonry works
1046(2)a2 150mm CHB Non-Load Bearing, (including Reinforcing steel)
1046(2)a1 100mm CHB Non-Load Bearing (Including Reinforcing Steel)
V Fabricated Materials and Hardware’s
W-1,2&3 uPVC Sliding window, Dark Oak Finish
D-1&2 Solid Panel Door, Tanguile KD in Paint Finish and Flush Door, uPVC in wenge Semi-Gloss Finish
VI. Finishing Works
1027(a) Plain Cement Plaster finish
1021(c-1) Plain cement floor Finish
VII Tile Works
1018(2) Glazed Wall Tiles and Unglanzed Tiles/ non-skid Tiles (CR)
VIII Carpentry Works
1003(1)a1 1/4thk” Marine Plywood on Metal Frame Celling, (CR only)
IX  Railings
1053(2)a2 1.5 inches, Ǿ Gauge #304 stainless pipe handrail on vertical railing stiffener
X Sanitary works
XI Plumbing Works (water line)
XII Roofing and Tinsmithry works
XIII Painting works,
1032(1)b Painting Works (MASONRY PAINTING)
1032(1)c Painting Works(STEEL/ METAL PAINTING),
XIV ELECTRICAL WORKS
BALER, AURORA1,200,000.00
CONSTRUCTION OF WATER FACILITY SO. CALANTAS
I General Requirements,
II Excavation,
III Concrete Works (CONSTRUCTION OF 3 ELEVATED),
IV Finishing,
V Formworks and scaffolding,
VI Construction of Free Flowing,
VII Fittings and Connections,
VIII Pipe Laying
CASIGURA, AURORA5,000,000.00
COMPLETION OF MULTI-PURPOSE BUILDING, BRGY. MATAWE
B.9 Mobilization/ Demobilization 
B.5(a) Project Signboard
B.5(b) Project Billboard/ Signboard (COA),
B.7 Construction safety and Health Program
I Removal of Existing Pavement,
104(1)a Embankment (from borrow),
900 Reinforced concrete,
903(2) Formworks and false works,
1032(1)c Painting Works(metal painting),
1032(1)a Painting works(masonry painting)
DINGALAN, AURORA1,000,000.00
IMPROVEMENT OF MULTI-PURPOSE BUILDING, BRGY. UMIRAY
B.9 Mobilization/ Demobilization 
B.5(a) Project Signboard
B.5(b) Project Billboard/ Signboard (COA),
B.7 Construction safety and Health Program
I Removal of Existing Pavement,
104(1)a Embankment (from borrow),
900 Reinforced concrete,
903(2) Formworks and false works,
1032(1)c Painting Works(metal painting),
1032(1)a Painting works(masonry painting)
DINGALAN, AURORA1,000,000.00
CONCRETING OF ROAD, BRGY. 03
SPCL General Requirements,
I.1 Mobilization/Demobilization,
I.2 Setting Out and Staking,
I.3 Construction Safety and Health Program,
I.4 Project Billboard (PGA),
I.5 Project Billboard (COA),
104 Embankment (from Borrow),
105 (1)Subgrade Preparation (Common Material),
200 Aggregate Base Course,
311(1) a.2 PCCP Pavement (plain) – Conventional Method, 200thk.,
MARIA AURORA, AURORA  3,000,000.00
CONSTRUCTION OF FARM TO MARKET ROAD,  BRGY. SAN LEONARDO
SPCL General Requirements,
I.1 Mobilization/Demobilization,
I.2 Setting Out and Staking,
I.3 Construction Safety and Health Program,
I.4 Project Billboard (PGA),
I.5 Project Billboard (COA),
104 Embankment (from Borrow),
105(1) Subgrade Preparation (Common Material),
200 Aggregate Base Course,
311(1)a.2 PCCP Pavement (plain) – Conventional Method, 200thk.,
103(1)a Structure Excavation (Common Soil),
500(1)a Pipe Culvert, 610mm dia.(24″Ǿ),
505(5)Grouted Riprap (Class A- Including Headwall)
MARIA AURORA, AURORA  3,000,000.00
CONSTRUCTION OF FMR, BRGY. BORLONGAN
PART A General Requirements,
 A.4 A.4 Construction Survey and staking
A.5(a) Project Signboard
A.5(b) Project billboard/Signboard (COA)
A.7 Occupational safety & Health program
A.9 mobilization and demobilization
PART B Earthworks
100(1) Clearing and Grubbing (with stripping)
102(2)a Roadway Excavation( Surplus Common)
104(1)a Embankment from Borrow
105(1) Subgrade Preparation (Common Material)
PART C Subbase and Base Course
200 Aggregate Subbase Course
PART D Surface course
311(1)a.2 PCCP Pavement (Plain) – Conventional Method, 200mm thk.
DIPACULAO, AURORA3,000,000.00
CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. ABULEG
I General Requirements
II Layout & Excavation
III Filling of Materials(Including Labor)
IV Concrete & Masonry Works
V Formworks & Scaffolding,
VI Fabricated Materials,
VII Doors & Windows,
VIII Painting Works,
IX Tile Works, (Including CR),
X Downspout,
XI Plumbing Works,
XIII Electrical Works.
Dinalungan, Aurora2,500,000.00
TOTAL  

Prospective bidders should possess a valid PCAB License applicable to the contract, have completed a similar contract with a value of at least 50% of the ABC, and have key personnel and equipment available for the prosecution of the contract.  The BAC will use non-discretionary pass/fail criteria in the Eligibility Check/Screening as well as the Preliminary Examination of Bids.  The BAC will conduct post-qualification of the lowest calculated bid.

The pertinent provisions of RA 9184 and its Implementing Rules and Regulations (IRR) shall govern all particulars relative to Eligibility Statement and Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation of Bids, Post Qualification and Award of Contract.

The schedule of BAC activities is as follows:

ActivitiesSchedule
1.  Issuance of Bid DocumentsFebruary 17, 2022-March 14, 2022 until 9:00 AM
2.  Pre-bid ConferenceMarch 2, 2022, @ 10:00AM
3.  Submission of Eligibility and BidsMarch 14, 2022 until 9:00 AM
4.  Opening of BidsMarch 14, 2022 @ 10:00 AM
  • Pre-Bid Conference/ Opening of Bids’ date is automatically re- scheduled to the next working day whenever such date is declared a holiday.

The BAC will issue to prospective bidders Eligibility Forms at BAC Secretariat Office, Capitol Compound, Baler, Aurora, upon their submission of a LOI.  Prospective bidders shall submit the Eligibility Requirements to the BAC at the said address.  They may also obtain the results of the

Eligibility Check by the BAC at the same address. Bids document will be available only to prospective bidders upon payment to the Provincial Treasurer’s Office (PTO) of the Provincial Government of Aurora (PGA) of non-refundable amount for the following approved budget for the contract:     

P 500,000.00 – below = P 500.00

          500,001.00 – 1,000,000.00 = 1,000.00

        1,000,001.00        –    5,000,000.00           =                    5,000.00

        5,000,001.00         –      10,000,000.00           =                  10,000.00

      10,000,001.00         –   50,000,000.00           =              25,000.00

      50,000,001.00         –   500,000,000.00           =              50,000.00

The Provincial Government of Aurora assumes no responsibility whatsoever to compensate or indemnify bidders for any expenses incurred in the preparation of the bid. Only those who have purchased the Bidding Documents shall be allowed to participate in the pre-bid conference and raise or submit written queries or clarifications.  The PGA also reserves the right to reject any or all bids, to declare the bidding a failure or waive any defect or informality and to accept bids as may be considered most advantageous to the PGA.