Name Of ProjectLocationApproved Budget for the Contract
CONSTUCTION OF MULTI-PURPOSE TRIBAL HALL, BRGY. DITALE
I GENERAL REQUIREMENTS,
II LAYOUT & EXCAVATION,
III FILLING OF MATERIALS,
IV CONCRETE & MASONRY WORKS,
V FORMWORKS & SCAFFOLDING,
VI ROOF FRAMING & TINSMITHRY WORKS,
VII FABRICATED PIPE RAILINGS,
VIII DOORS & WINDOWS,
IX PLUMBING WORKS, (ROUGH-INS)
X ELECTRICAL WORKS (ROUGH-INS)
DIPACULAO, AURORA1,000,000.00
CONSTRUCTION OF BOX CULVERT WITH RIPRAP APADTC (OPAG), BRGY. CALABUANAN
I.1 Mobilization/Demobilization
I.2 Setting out & Stoking
I.3 Construction Safety and Health Program
I.4 Project Signboard (PGA & COA) and Signages
103(1)a Structure Excavation (common soil)
104(1)a Embankment (from Barrow)
1710(2)a Grouted Riprap (Class A)
404 Reinforcing Steel Bar, Grade 40 (minor Structures)
405 Structural Concrete Class A (Minor Structures)
BALER, AURORA500,000.00
CONSTRUCTION OF SENIOR CITIZENS BUILDING, BRGY. OBLIGACION
I General Requirements
II Earth Works,
803 Excavation of Column,  Footing and WF Footing
804(a) Backfilling of excavated, Materials
804(b) Gravel Bedding
III Concrete Works,
900 Reinforce Concrete
902(1)a1 Reinforcing Steel of Reinforced Concrete structures, grade 40,
903(2) Formworks and Falseworks
IV Masonry works
1046(2)a2 150mm CHB Non-Load Bearing, (including Reinforcing steel)
1046(2)a1 100mm CHB Non-Load Bearing (Including Reinforcing Steel)
V Fabricated Materials and Hardware’s
W-1,2&3 uPVC Sliding window, Dark Oak Finish
D-1&2 Solid Panel Door, Tanguile KD in Paint Finish and Flush Door, uPVC in wenge Semi-Gloss Finish
VI. Finishing Works
1027(a) Plain Cement Plaster finish
1021(c-1) Plain cement floor Finish
VII Tile Works
1018(2) Glazed Wall Tiles and Unglanzed Tiles/ non-skid Tiles (CR)
VIII Carpentry Works
1003(1)a1 1/4thk” Marine Plywood on Metal Frame Celling, (CR only)
IX  Railings
1053(2)a2 1.5 inches, Ǿ Gauge #304 stainless pipe handrail on vertical railing stiffener
X Sanitary works
XI Plumbing Works (water line)
XII Roofing and Tinsmithry works
XIII Painting works,
1032(1)b Painting Works (MASONRY PAINTING)
1032(1)c Painting Works(STEEL/ METAL PAINTING),
XIV ELECTRICAL WORKS
BALER, AURORA1,200,000.00
TOTAL  

Prospective bidders should possess a valid PCAB License applicable to the contract, have completed a similar contract with a value of at least 50% of the ABC, and have key personnel and equipment available for the prosecution of the contract.  The BAC will use non-discretionary pass/fail criteria in the Eligibility Check/Screening as well as the Preliminary Examination of Bids.  The BAC will conduct post-qualification of the lowest calculated bid.

The pertinent provisions of RA 9184 and its Implementing Rules and Regulations (IRR) shall govern all particulars relative to Eligibility Statement and Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation of Bids, Post Qualification and Award of Contract.

The schedule of BAC activities is as follows:

ActivitiesSchedule
1.  Issuance of Bid DocumentsMarch 29, 2022-April 18, 2022 until 9:00 AM
2.  Pre-bid ConferenceApril 6, 2022, @ 10:00AM
3.  Submission of Eligibility and BidsApril 18, 2022 until 9:00 AM
4.  Opening of BidsApril 18, 2022 @ 10:00 AM
  • Pre-Bid Conference/ Opening of Bids’ date is automatically re- scheduled to the next working day whenever such date is declared a holiday.

The BAC will issue to prospective bidders Eligibility Forms at BAC Secretariat Office, Capitol Compound, Baler, Aurora, upon their submission of a LOI.  Prospective bidders shall submit the Eligibility Requirements to the BAC at the said address.  They may also obtain the results of the

Eligibility Check by the BAC at the same address. Bids document will be available only to prospective bidders upon payment to the Provincial Treasurer’s Office (PTO) of the Provincial Government of Aurora (PGA) of non-refundable amount for the following approved budget for the contract:

P                                 500,000.00           –                   below                   =              P                   500.00

                                     500,001.00          –                   1,000,000.00        =                                1,000.00

                                  1,000,001.00          –                   5,000,000.00        =                                5,000.00

                                  5,000,001.00          –                 10,000,000.00        =                              10,000.00

                                10,000,001.00          –                 50,000,000.00        =                              25,000.00

                                50,000,001.00          –                500,000,000.00         =                              50,000.00

The Provincial Government of Aurora assumes no responsibility whatsoever to compensate or indemnify bidders for any expenses incurred in the preparation of the bid. Only those who have purchased the Bidding Documents shall be allowed to participate in the pre-bid conference and raise or submit written queries or clarifications.  The PGA also reserves the right to reject any or all bids, to declare the bidding a failure or waive any defect or informality and to accept bids as may be considered most advantageous to the PGA.