The PROVINCIAL GOVERNMENT OF AURORA, through its Bids and Awards Committee (BAC), invites all eligible contractors registered with and classified by the Philippine Contractors Accreditation Board (PCAB), to bid for the hereunder contract:

Name Of ProjectLocationApproved Budget for the Contract
REHABILITATION OF BARANGAY HEALTH CENTER, BRGY. DECOLIAT
I. GENERAL REQUIREMENTS (including Transhipment),
II. REMOVAL OF EXISTING STRUCTURE
III.  CONCRETE & MASONRY WORKS
IV.  FORM WORKS & SCAFFOLDING
V.  ROOF FRAMING & TINSMITHRY WORKS
VI. CEILING WORKS,
VII. TILE WORKS
VIII. DOORS & WINDOWS
IX. PAINTING WORKS
X. PLUMBING WORKS
XI. ELECTRICAL WORKS
Maria Aurora, Aurora1,000,000.00
COMPLETION OF TWO-STOREY MULTI-PURPOSE BUILDING, BRGY. LOBBOT
I GENERAL REQUIREMENTS
II MOBILIZATION & DEMOBILIZATION
III CONSTRUCTION HEALTH SAFETY & PROJECT SIGN
BOARD (COA & PGA),
IV CONCRETE MASONRY WORKS
V FORMWORKS & SCAFFOLDING
VI FABRICATED MATERIALS
VII CARPENTRY WORKS
VII DOORS & WINDOWS
IX PAINTING WORKS
X TILE WORKS(INCLUDING CR)
XI DOWNSPOUT
XII PLUMBLING WORKS
XIII ELECTRICAL WORKS
Dipaculao, Aurora3, 000,000.00
MULTI-PURPOSED HALL (TRIBAL HALL), BRGY. BAYABAS
 
I.  GENERAL REQUIREMENTS
II. LAYOUT & EXCAVATION
III. FILLING OF MATERIALS
IV. CONCRETE & MASONRY WORK
V. FORMWORKS & SCAFFOLDING
VI. DOORS & WINDOWS
VII. TINSMITHRY WORKS
VIII PAINTING WORKS
IX.TILE WORKS (INCLUDING CR)
X. DOWNSPOUT
XI. PLUMBING WORKS
XII. ELECTRICAL WORKS
Dipaculao, Aurora    2,000,000.00    
CONSTRUCTION OF MULTI-PURPOSE HALL, BRGY. PUNGLO
SPCL I GENERAL REQUIREMENTS (PGA & COA SIGN BOARD, CONSTRUCTION SAFETY & HEALTH PROGRAM AND OTHE REQUIRED DOCUMENTS),
SPCL II MOBILIZATION & DEMOBILIZATION
803(1)a STRUCTURE EXCAVATION (COMMON SOIL)
804 GRAVEL BEDDING
900 REINFORCE CONCRETE
902(1)a1  REINFORCING STEEL OF REINFORCED CONCRETE STRUCTURE GRADE 40
903(2) FORMWORKS AND FALSE WORKS
1027(1)  CEMENT PLASTER FINISH (ROUGH-IN),  1047(2)b STRUCTURAL STEEL PURLINS
1047(2)a  STRUCTURAL STEEL, TRUSSES, STRUCT, 1047(6) METAL STRUCTURE ACCESSORIES (STEEL PLATES)
1047(7)b  METAL STRUCTURE ACCESSORIES (SAGRODS), 1047(4) METAL STRUCTURE ACCESSORIES (CROSSBRACING)
1047(3)c  METAL STRUCTURE ACCESSORIES (TURNBUCKLE)
1014(1)b1 PREPAINTED METAL SHEETS (PREPAINTED, LONG SPAN, 0.5MM THK.)
1032(1)c
PAINTING WORKS (METAL PAINTING)
SPCL III ELECTRICAL WORKS (ROUGH-IN)
Maria Aurora, Aurora2,500,000.00
COMPLETION OF MULTI-PURPOSE BUILDING, BRGY. DIBALO
 
I Transhipment of Materials
SPCL I  General Requirements
804 Embankment
704.3 Concrete Masonry Blocks
900 Reinforced Concrete
902(1) a1 Reinforcing Steel of Reinforced Concrete Structures, Grade 40
903(2) Formworks and Falseworks
1027(1)   Cement Plaster Finish
1047(2)a  Structural Steel, trusse, strut,
1047(6)  Metal structure Accessories (steel plates)
1014(1)b1  Prepainted Metal Sheets (Corrugated, Long span, 0.5mm thk.)
1032 Painting Works, (concrete surfaces)
1032(1)c  Painting works (Metal Painting),
1722(1)c Fence and raillings( cyclone/ weldedwire)
San Luis, Aurora2,500,000.00
CONCRETING OF FMR PUROK 4, BRGY. CALAOCAN
Part A General Requirements,
A.4 A.4 Construction Survey and staking,
 A.5(a) Project Signboard
A.5(b)  Project billboard/Signboard (COA),
A.7 Occupational safety & Health program,
A.9 mobilization and demobilization,
Part B Earthworks
100(1) Clearing and Grubbing (with stripping)
102(2)a Roadway Excavation(surplus common),
104(1)a Embankment from borrow,
105(1) Subgrade Preparation, (Common Materials),
Part C Subbase and base course,
200.0 Aggregate subbase course,
Part D Surface course,
311(1)a2 PCC Pavement (Plain)- conventional method 200mm thk.),
Part E  Pipe,
500(1)a Pipe culverts, 610mm dia (24″ dia)
Dipaculao, Aurora1,000,000.00
CONSTRUCTION OF LANDMARK, SITIO AMPER, BRGY. GUPA
I  General Requirements
II Layout Excavation & Backfilling,
III Filling of Materials,
IV Concrete Works
Dipaculao, Aurora200,000.00
TOTAL  

Prospective bidders should possess a valid PCAB License applicable to the contract, have completed a similar contract with a value of at least 50% of the ABC, and have key personnel and equipment available for the prosecution of the contract.  The BAC will use non-discretionary pass/fail criteria in the Eligibility Check/Screening as well as the Preliminary Examination of Bids.  The BAC will conduct post-qualification of the lowest calculated bid.

The pertinent provisions of RA 9184 and its Implementing Rules and Regulations (IRR) shall govern all particulars relative to Eligibility Statement and Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation of Bids, Post Qualification and Award of Contract.

The schedule of BAC activities is as follows:

ActivitiesSchedule
1.  Issuance of Bid DocumentsMay 24, 2022-June 13, 2022 until 9:00 AM
2.  Pre-bid ConferenceJune 1, 2022, @ 10:00AM
3.  Submission of Eligibility and BidsJune 13, 2022 until 9:00 AM
4.  Opening of BidsJune 13, 2022 @ 10:00 AM
  • Pre-Bid Conference/ Opening of Bids’ date is automatically re- scheduled to the next working day whenever such date is declared a holiday.

The BAC will issue to prospective bidders Eligibility Forms at BAC Secretariat Office, Capitol Compound, Baler, Aurora, upon their submission of a LOI.  Prospective bidders shall submit the Eligibility Requirements to the BAC at the said address.  They may also obtain the results of the

Eligibility Check by the BAC at the same address. Bids document will be available only to prospective bidders upon payment to the Provincial Treasurer’s Office (PTO) of the Provincial Government of Aurora (PGA) of non-refundable amount for the following approved budget for the contract:     

P           500,000.00               –                       below                        =                  P                      500.00

             500,001.00              –                       1,000,000.00           =                                       1,000.00

1,000,001.00              –                       5,000,000.00           =                                        5,000.00

         5,000,001.00              –                     10,000,000.00           =                                      10,000.00

         10,000,001.00              –                     50,000,000.00           =                                      25,000.00

           50,000,001.00              –                 500,000,000.00           =                                      50,000.00

The Provincial Government of Aurora assumes no responsibility whatsoever to compensate or indemnify bidders for any expenses incurred in the preparation of the bid. Only those who have purchased the Bidding Documents shall be allowed to participate in the pre-bid conference and raise or submit written queries or clarifications.  The PGA also reserves the right to reject any or all bids, to declare the bidding a failure or waive any defect or informality and to accept bids as may be considered most advantageous to the PGA.