The PROVINCIAL GOVERNMENT OF AURORA, through its Bids and Awards Committee (BAC), invites all eligible contractors registered with and classified by the Philippine Contractors Accreditation Board (PCAB), to bid for the hereunder contract:
Name Of Project | Location | Approved Budget for the Contract |
REHABILITATION OF BARANGAY HEALTH CENTER, BRGY. DECOLIAT I. GENERAL REQUIREMENTS (including Transhipment), II. REMOVAL OF EXISTING STRUCTURE III. CONCRETE & MASONRY WORKS IV. FORM WORKS & SCAFFOLDING V. ROOF FRAMING & TINSMITHRY WORKS VI. CEILING WORKS, VII. TILE WORKS VIII. DOORS & WINDOWS IX. PAINTING WORKS X. PLUMBING WORKS XI. ELECTRICAL WORKS | Maria Aurora, Aurora | 1,000,000.00 |
COMPLETION OF TWO-STOREY MULTI-PURPOSE BUILDING, BRGY. LOBBOT I GENERAL REQUIREMENTS II MOBILIZATION & DEMOBILIZATION III CONSTRUCTION HEALTH SAFETY & PROJECT SIGN BOARD (COA & PGA), IV CONCRETE MASONRY WORKS V FORMWORKS & SCAFFOLDING VI FABRICATED MATERIALS VII CARPENTRY WORKS VII DOORS & WINDOWS IX PAINTING WORKS X TILE WORKS(INCLUDING CR) XI DOWNSPOUT XII PLUMBLING WORKS XIII ELECTRICAL WORKS | Dipaculao, Aurora | 3, 000,000.00 |
MULTI-PURPOSED HALL (TRIBAL HALL), BRGY. BAYABAS I. GENERAL REQUIREMENTS II. LAYOUT & EXCAVATION III. FILLING OF MATERIALS IV. CONCRETE & MASONRY WORK V. FORMWORKS & SCAFFOLDING VI. DOORS & WINDOWS VII. TINSMITHRY WORKS VIII PAINTING WORKS IX.TILE WORKS (INCLUDING CR) X. DOWNSPOUT XI. PLUMBING WORKS XII. ELECTRICAL WORKS | Dipaculao, Aurora | 2,000,000.00 |
CONSTRUCTION OF MULTI-PURPOSE HALL, BRGY. PUNGLO SPCL I GENERAL REQUIREMENTS (PGA & COA SIGN BOARD, CONSTRUCTION SAFETY & HEALTH PROGRAM AND OTHE REQUIRED DOCUMENTS), SPCL II MOBILIZATION & DEMOBILIZATION 803(1)a STRUCTURE EXCAVATION (COMMON SOIL) 804 GRAVEL BEDDING 900 REINFORCE CONCRETE 902(1)a1 REINFORCING STEEL OF REINFORCED CONCRETE STRUCTURE GRADE 40 903(2) FORMWORKS AND FALSE WORKS 1027(1) CEMENT PLASTER FINISH (ROUGH-IN), 1047(2)b STRUCTURAL STEEL PURLINS 1047(2)a STRUCTURAL STEEL, TRUSSES, STRUCT, 1047(6) METAL STRUCTURE ACCESSORIES (STEEL PLATES) 1047(7)b METAL STRUCTURE ACCESSORIES (SAGRODS), 1047(4) METAL STRUCTURE ACCESSORIES (CROSSBRACING) 1047(3)c METAL STRUCTURE ACCESSORIES (TURNBUCKLE) 1014(1)b1 PREPAINTED METAL SHEETS (PREPAINTED, LONG SPAN, 0.5MM THK.) 1032(1)c PAINTING WORKS (METAL PAINTING) SPCL III ELECTRICAL WORKS (ROUGH-IN) | Maria Aurora, Aurora | 2,500,000.00 |
COMPLETION OF MULTI-PURPOSE BUILDING, BRGY. DIBALO I Transhipment of Materials SPCL I General Requirements 804 Embankment 704.3 Concrete Masonry Blocks 900 Reinforced Concrete 902(1) a1 Reinforcing Steel of Reinforced Concrete Structures, Grade 40 903(2) Formworks and Falseworks 1027(1) Cement Plaster Finish 1047(2)a Structural Steel, trusse, strut, 1047(6) Metal structure Accessories (steel plates) 1014(1)b1 Prepainted Metal Sheets (Corrugated, Long span, 0.5mm thk.) 1032 Painting Works, (concrete surfaces) 1032(1)c Painting works (Metal Painting), 1722(1)c Fence and raillings( cyclone/ weldedwire) | San Luis, Aurora | 2,500,000.00 |
CONCRETING OF FMR PUROK 4, BRGY. CALAOCAN Part A General Requirements, A.4 A.4 Construction Survey and staking, A.5(a) Project Signboard A.5(b) Project billboard/Signboard (COA), A.7 Occupational safety & Health program, A.9 mobilization and demobilization, Part B Earthworks 100(1) Clearing and Grubbing (with stripping) 102(2)a Roadway Excavation(surplus common), 104(1)a Embankment from borrow, 105(1) Subgrade Preparation, (Common Materials), Part C Subbase and base course, 200.0 Aggregate subbase course, Part D Surface course, 311(1)a2 PCC Pavement (Plain)- conventional method 200mm thk.), Part E Pipe, 500(1)a Pipe culverts, 610mm dia (24″ dia) | Dipaculao, Aurora | 1,000,000.00 |
CONSTRUCTION OF LANDMARK, SITIO AMPER, BRGY. GUPA I General Requirements II Layout Excavation & Backfilling, III Filling of Materials, IV Concrete Works | Dipaculao, Aurora | 200,000.00 |
TOTAL |
Prospective bidders should possess a valid PCAB License applicable to the contract, have completed a similar contract with a value of at least 50% of the ABC, and have key personnel and equipment available for the prosecution of the contract. The BAC will use non-discretionary pass/fail criteria in the Eligibility Check/Screening as well as the Preliminary Examination of Bids. The BAC will conduct post-qualification of the lowest calculated bid.
The pertinent provisions of RA 9184 and its Implementing Rules and Regulations (IRR) shall govern all particulars relative to Eligibility Statement and Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation of Bids, Post Qualification and Award of Contract.
The schedule of BAC activities is as follows:
Activities | Schedule |
1. Issuance of Bid Documents | May 24, 2022-June 13, 2022 until 9:00 AM |
2. Pre-bid Conference | June 1, 2022, @ 10:00AM |
3. Submission of Eligibility and Bids | June 13, 2022 until 9:00 AM |
4. Opening of Bids | June 13, 2022 @ 10:00 AM |
- Pre-Bid Conference/ Opening of Bids’ date is automatically re- scheduled to the next working day whenever such date is declared a holiday.
The BAC will issue to prospective bidders Eligibility Forms at BAC Secretariat Office, Capitol Compound, Baler, Aurora, upon their submission of a LOI. Prospective bidders shall submit the Eligibility Requirements to the BAC at the said address. They may also obtain the results of the
Eligibility Check by the BAC at the same address. Bids document will be available only to prospective bidders upon payment to the Provincial Treasurer’s Office (PTO) of the Provincial Government of Aurora (PGA) of non-refundable amount for the following approved budget for the contract:
P 500,000.00 – below = P 500.00
500,001.00 – 1,000,000.00 = 1,000.00
1,000,001.00 – 5,000,000.00 = 5,000.00
5,000,001.00 – 10,000,000.00 = 10,000.00
10,000,001.00 – 50,000,000.00 = 25,000.00
50,000,001.00 – 500,000,000.00 = 50,000.00
The Provincial Government of Aurora assumes no responsibility whatsoever to compensate or indemnify bidders for any expenses incurred in the preparation of the bid. Only those who have purchased the Bidding Documents shall be allowed to participate in the pre-bid conference and raise or submit written queries or clarifications. The PGA also reserves the right to reject any or all bids, to declare the bidding a failure or waive any defect or informality and to accept bids as may be considered most advantageous to the PGA.